• May 2001, film #1
    Installation of shutter doors for bay 5 at Los Leones
  • May 2001, film #2
    Installation of shutter doors for bay 5 at Los Leones, some pictures of tanks in the Engineering Array and a few shots of the Andes and landscape.
  • May 2001, film #3
    Shots of details of support for lenses and work on some tanks in the field.
  • July 2001
    Works in the Pampas on the engineering array
  • February/March 2002
    CDAS/FDE school, work in the Pampas on the engineering array
  • March/April 2003
    Shutter and apperture box installation at Los Leones and Coihueco, pre-production tank deployment